logo
September 6, 2010

Ridgeview Lodge Care Facility

Project Name:
Ridgeview Lodge Care Facility
Desmond Road
Kamloops, BC

Engineering Consultant: Brad Lively, EIT
Stantec Consulting
1620 Dickson Ave.
Kelowna, BC
V1Y 9Y2
General Contractor Brentwood Enterprises
System

Atlantis Double modules
Infiltration System
Rainwater from roofs entering rain tank then infiltrating into the ground.
Tank volume to handle 100-yr storm event. No city storm mains at the site.

Tank Volume  4 tanks totaling 200 m3
Installation Date  March/April 2008

Shown are some photographs from site visits. These can be used to verify the satisfactory installation and the product will meet the desired function of your design.

 
   
   

Contacts 

In Western Canada Contact:
Stuart Whitling, P.Eng.
Business Development Manager
Tel: (250) 765-3653
Toll Free: (877) 765-3653
Cell: (250) 469-3114
Email: swhitling@emcoltd.com
In the Lower Mainland/Vancouver Island Contact:
Rachel Poupore, EIT.
Business Development Engineer
Tel: (604) 888-5533
Toll Free: (800) 242-2397
Cell: (778) 773-0340
Email: rpoupore@emcoltd.com
 
 
In Eastern Canada Contact:
Calvin Reaume, P.Eng.
Business Development Manager
Tel: (905) 564-7788
Toll Free: (866) 271-9322
Cell: (416) 407-9878
Email: creaume@emcoltd.com